Egress Window Installation in Beaverton, OR

 
 

The day before VResh Construction opens the ground for a Beaverton window well, it requests an inspection of a silt fence. Beaverton's residential inspection handout is the reason: "Erosion control inspection shall be requested one day prior to the scheduled footing/foundation inspection and receive approval prior to any requests for footing or foundation inspections." A footing request made without that approval, or on the same day as it, "will not be performed until erosion control approval has been obtained." On a poured well, the well's base and drain are that footing. So, the silt fence around a pile of excavated soil the size of a dining table is inspected first, and everything the main egress window page describes- the cut, the header, the well, the window- waits on that pass.

 

The fence, then the pins

Beaverton assigns inspectors by 7 a.m. and rolls any same-day request to the next business day, so the erosion request goes in the day before the dig and the footing request the day of it. When the inspector comes, two more things have to be on site, or there is no inspection: the city's stamped plans, which "must be on site and available for the inspector's use or the inspection cannot be performed," and a sign at the street with the job address; failing to post it, the handout says, "may result in you not receiving your inspection." If you are the homeowner, the sign is the one thing the crew will ask you to leave alone.

The plan set behind the stamps carries what Beaverton's residential checklist asks for on an alteration, and one line on that list comes up before the estimate: "radon mitigation information." The state requires radon-resistant construction in new houses in Washington County, and on a house built with a sub-slab system, the well cut is drawn so the system is not opened.

Beaverton's footing inspection checks that "reinforcing is in place per plans, and form work completed," and it checks the property line: "property pins are required to be exposed for this inspection so required setbacks can be verified." That rule matters more on a window well than on most footings, because Beaverton's list of what may project into a required yard- sills and eaves at 2 feet where the side setback is 5 feet, open fire escapes at 4 feet 6 inches- does not mention a window well, and a well inside a recorded utility easement needs an encroachment permit, issued by the City Attorney with the City Engineer's consent, settled at the drawing stage. VResh has the pins located before the site plan is finished, so the drawing shows the well's distance to the line, and the inspector can see the same number in the ground.

After the footing passes, the order is the one every egress job follows and the main page lays out; Beaverton's final inspection is signed only after the erosion control, plumbing, and electrical finals have passed.

What the plan set has to show

Beaverton's residential checklist says it is "a guide and shall not be considered a complete list," but for an egress cut it is close to one. The site plan carries "location, size, and slope of rain drains and under-floor/footing drains" and "building finish floor elevations and elevations at all property corners." Elevation views, "a minimum of 2 views" for an exterior alteration, "need to reflect the actual grade," which on a well is the point: the drawing shows the well rim against the real lawn. The existing floor plan and the proposed one both show "window and door locations and dimensions," so the old basement window and the new egress unit appear side by side with their sizes, and the proposed plan gives "each room's use with dimensions," which is where the room becomes a bedroom on paper. The structural sheet lists the header over the new opening, and the footing detail shows "dimensions, required reinforcement, frost depth, anchorage, stem wall height." Then the smoke and carbon monoxide detectors and the radon line already mentioned. VResh draws the site plan and the header for a Beaverton basement before the estimate is final, because the header size and the drain route are what the estimate is built on.

Two of the handout's smaller rules land before the first cut. "Revisions and field changes to approved plans shall be submitted to and approved by the City plans examiner prior to requesting an inspection for that portion of the project," so a well moved 2 feet along the wall on the day of the dig is a revision, and it goes back to the plans examiner. And "reinspection fees are assessed for each inspection when the City receives too many inspection requests for the same correction item(s), or the inspection isn't ready when the inspector arrives," which is the reason the erosion request goes in only when the fence is actually up.

Serving Portland Metro Area

VResh Construction provides window replacement, siding installation, roofing, dry rot repair and full exterior renovation services throughout the Portland metro area and Southwest Washington.

Portland Metro — Oregon

Southwest Washington

Extended Service Areas

Group of five people standing and sitting next to a white service van with a sign on the side, one person holding a spirit level, another with a clipboard, and one with a tool belt, outdoors in parking lot with leafless trees in the background.

(503) 272-6436 — Call or Text, Available 24/7

We answer calls and texts at any hour. For storm damage, active leaks, or structural emergencies, calling directly is the fastest path to a response.

OUR FAQS

Egress window questions from Beaverton, OR

Why does the schedule start with erosion control on a job this small?
+
Because the handout ties every footing inspection to a prior erosion approval regardless of size, and the well's base is a footing. The silt fence and the spoil cover go up before the excavator does, and the request is made the day before.
Can the well drain run to daylight in the yard?
+
Beaverton's manual routes single-family foundation drains to the curb or the storm main and, where a curb connection is impossible, directly to the storm main. A well drain is treated as one of those drains, and the outlet is shown on the plans.
Can the basement become a separate apartment for family?
+
Beaverton allows it, and a converted whole floor is "not subject to the size limitations" that cap other ADUs at 800 square feet. What makes it an apartment rather than a bedroom is in the city's handout: a separate exterior entrance or a shared entry area open to the outside, one-hour fire separation where new walls are built, its own heating system and its own address. The ADU application is a Type 1 decision, made by staff. As of the city's 2023 system development charge memo, Beaverton had no ADU exemption from its system development charges, and both that status and which construction taxes apply to a conversion that adds no floor area are confirmed with the Building Division at application.
Can the well be moved a few feet once the permit is issued?
+
The plans examiner decides that one, under the revision rule quoted above. A well that has to shift for a footing drain or a tree root is redrawn, approved, and only then scheduled, so the move costs a day of drawing rather than a failed inspection.
Close-up of large gold quotation marks on a black background

Client's Talk

We have a wealth of experience working as main building contractors on all kinds of projects, big and small, from home maintenance and improvements to extensions, refurbishments and new builds.

The sign, the fence, the pins

Bring VResh the address and the basement, and the rest is scheduling. Call or text (503) 272-6436.