More than 4,000 acres of Salem are floodplain, and the city counts "approximately 3,000 individual parcels that are partially or entirely located within the floodplain." On any of them, digging a window well is not a detail of the building permit. It is "development," which Salem's floodplain rules define as including "excavation or drilling operations," and it requires a Floodplain Development Permit that comes first: "Associated site work or building permits for the proposed development will not be issued until the Floodplain Development Permit is approved." So before VResh Construction measures a Salem basement window, it looks up the address on the city's floodplain map.

 

Two checks before the drawing

Every Salem egress estimate is run through the same two city maps before the well is placed, and the result decides which permits come before the building permit:

Outside both maps, a Salem egress window is the building permit the main egress window page describes, with the well drain drawn on the plot plan where the city asks for the footing and rain drains.

Inside the floodplain: what the permit asks

Since July 9, 2025, Salem issues two kinds of floodplain permits. A Class 1 covers development in the special flood hazard area "which does not require a Mitigation Assessment," the applicant's showing of no net loss of flood storage, water quality, or riparian vegetation; a Class 2 covers development that does. The application asks for a Substantial Improvement Worksheet, "including a calculation for any improvement, addition, reconstruction, renovation, or rehabilitation of an existing structure," and that worksheet determines whether the basement can remain a basement.

The 50 percent line

Salem's floodplain chapter defines a basement as "any area of the building having its floor subgrade (below ground level) on all sides" and the lowest floor as "the lowest floor of the lowest enclosed area (including basement)." It requires that "new construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated no less than one foot above the base flood elevation," the flood height on the federal map, and that enclosed areas below it "shall be limited only to crawl spaces or below-grade crawl spaces." Substantial improvement is any work whose cost "equals or exceeds 50 percent of the market value of the structure."

Put together for an existing house in the zone: an egress window is a small improvement, but an egress window inside a larger remodel that crosses half the structure's value makes the whole house "substantially improved," and a substantially improved house may not keep a basement below the flood elevation. The worksheet is the city's arithmetic, completed on the city's form. What VResh does on a floodplain parcel is write the estimate so you can see where the egress work sits in that sum before deciding what else to do to the house in the same year.

The permit itself

Salem takes residential permits online only, through its Permit Application Center portal, and its intake is fast and specific: after the application is filed, "you will receive an email with a link to upload the documents to be reviewed. Upload the requested files within 48 hours," and "staff will review your files for completeness within 48 hours." Plan review does not start until the plan check fee is paid, and the city's residential checklist says what the file has to contain for a basement egress cut: a foundation plan "including footing size, wall height, sections and required reinforcing," existing and proposed floor plans "for alterations and additions," the "location, size, and slope of rain drains and under-floor/footing drain," engineering "for special conditions" as a stamped packet, a geotechnical report where the site needs one, and an erosion control plan "for ground disturbing activity of 1,000 square feet or 25 cubic yards of excavation/fill," which is well above a single window well. Once the permit is issued, the first inspection has to be requested within 180 days to keep it alive, and each inspection after that extends the permit by another 180 days, so a permit waiting on a later inspection stays alive.

One Salem-only line sits on the same permit. The city's seismic page says that "if your house was built before 1986, you should consider a seismic upgrade," because the statewide code that year required the house to be bolted to its foundation with half-inch diameter bolts every 6 feet, and the city publishes anchor-bolt and cripple-wall details. An egress cut opens the sill plate at exactly the place those bolts go. On a pre-1986 house that is the moment to ask about it, and the city's detail sheet is the drawing to hand to whoever does the work.

Which Salem basements

About 48 percent of Salem's homes were built before 1980 and 9.4 percent before 1940. The oldest are the bungalows of Gaiety Hill and the late-1800s houses east of the Capitol in Court-Chemeketa, houses that usually have full basements, in two National Register districts where a new basement window is an exterior alteration: the residential standards in SRC 230.025 are written about repairing and replacing windows rather than cutting new ones, so which review class a new opening falls into is settled with the city's Historic Preservation Officer before the plans are drawn; the city's guide says "vinyl windows are not an approved material in historic homes," and the city puts a Class 1 review at about 30 days, a Class 2 at about 45 with a 14-day comment period, and a Class 3 at about 60 with a commission hearing. The 1970s, the city's largest single decade, are the daylight basements of the Salem Hills in the south and the Eola Hills in West Salem, which is where the landslide chapter above applies. On the valley floor between them, a 1968 soil survey for the Salem area rated the Amity, Dayton, and Concord silts "severe" or "very severe" for basements because of their winter water tables, against "slight" for the Salem gravelly silt loam on the old river terraces, and many of those tracts were built without a basement at all.

Serving Portland Metro Area

VResh Construction provides window replacement, siding installation, roofing, dry rot repair and full exterior renovation services throughout the Portland metro area and Southwest Washington.

Portland Metro — Oregon

Southwest Washington

Extended Service Areas

Group of five people standing and sitting next to a white service van with a sign on the side, one person holding a spirit level, another with a clipboard, and one with a tool belt, outdoors in parking lot with leafless trees in the background.

(503) 272-6436 — Call or Text, Available 24/7

We answer calls and texts at any hour. For storm damage, active leaks, or structural emergencies, calling directly is the fastest path to a response.

OUR FAQS

Egress window questions from Salem, OR

Does a window well really need a floodplain permit if the house is not changing?
+
Inside the mapped floodplain, yes. Salem's definition of development includes excavation, and a Class 1 or Class 2 permit is approved before the building permit is issued. Outside it, there is no floodplain step.
Can the well sit in the side setback?
+
Salem's table of what may project into a setback lists window bays, chimneys, sills, eaves, and steps and has no row for a window well. A 36-inch well in a 5-foot side yard is a question for Planning at 503-588-6213, asked before the well is drawn on a side wall.
Is a basement conversion ever exempt from a permit in Salem?
+
The city's own exempt-work guideline allows interior non-bearing partitions without a permit only "if that wall is not part of or being used to create bedrooms, an ADU, garage or basement conversion," and adds that electrical, mechanical and plumbing permits apply regardless. A basement bedroom is a building permit.
Does Salem waive anything for a basement apartment?
+
For an ADU, Salem waives its system development charges automatically, requires no land-use application or parking, and the city's ADU page lists "a basement apartment" as an example. ADUs cannot be short-term rentals. West Salem addresses are in Polk County, which has adopted radon-resistant construction rules; the Marion County side has not, and the state's health division recommends testing any home regardless.
Should the sill get bolted while the wall is open?
+
On a house built before 1986, the question goes to the city's Building and Safety Division first. The city's own page recommends the upgrade and publishes the anchor-bolt detail, and the egress cut exposes the sill plate at the opening, which is the easiest moment to reach it. Whether the bolting goes on the same permit is a question for the Permit Application Center.
How long does the city take to review the plans?
+
Salem publishes average review times on a dashboard it updates monthly rather than promising a turnaround. What it does commit to is the front end: the upload link arrives by email, the files are returned within 48 hours, and staff checks them for completeness within another 48 hours.
Close-up of large gold quotation marks on a black background

Client's Talk

We have a wealth of experience working as main building contractors on all kinds of projects, big and small, from home maintenance and improvements to extensions, refurbishments and new builds.

Check the map before the estimate

If your Salem house is on either map, the permit order changes, and so does the schedule behind it. Call or text (503) 272-6436.